Conveyor and steel walkway structure at a mining infrastructure site

Selected Major Project Track Record

Underground and surface mining infrastructure delivered for leading mining groups.

Project Spotlights

A closer look at selected ground handling and conveyor projects.

Finsch Diamond Mine

Finsch Diamond Mine

Block 5 ground handling: ore pass and crusher systems, designed and installed.

Cullinan Diamond Mine: C-C 1 East

Cullinan Diamond Mine: C-C 1 East

Design of the entire ground handling system at CC1E.

Cullinan: C-Cut Phase 2

Cullinan: C-Cut Phase 2

Ground handling system design for the C-Cut Phase II project.

Platreef Mine EC&I

Platreef Mine EC&I

Phase 2 turnkey electrical, control and instrumentation for Ivanhoe Mines.

Venetia Underground

Venetia Underground

Phase 1 underground infrastructure for De Beers Group across four levels.

Nchwaning I & III

Nchwaning I & III

Complete ground handling installation for Assmang Manganese.

Karowe Mine

Karowe Mine

Crusher conveyors, high-head pump station and workshop for Lucara Diamond.

Harmony Gold

Harmony Gold

Tshepong and Bambanani shaft pillar and decline projects.

Aerial view of the completed Mooiplaats Solar PV array

Mooiplaats Solar PV

Pile foundations, trackers and PV modules for a 32.75 MW solar plant in the Northern Cape.

Client & MineProject FocusTechnical Scope & Key Deliverables Executed
Ivanhoe Mines
Platreef Mine
Phase 2 EC&I InfrastructureTurnkey surface & underground EC&I: Main vent fans, fridge plant, chillers, winder house MV substation, PFC yard, underground crushers, conveyors, fuel/lubrication/emulsion distribution stations, and shaft depth detection.
De Beers Group
Venetia Underground
Phase 1 CSMPP Underground InfrastructureStructural, mechanical, piping, and EC&I installation across Levels 51, 54, 56, and 59. Hydro-actuated ventilation doors, high-pressure water doors, water walls, civil substations, degritter systems, and main pump station.
Assmang Manganese
Nchwaning I & III
Phase 1 & 2 InfrastructureComplete ground handling installation: Primary jaw crusher station, 6 x crusher feed conveyors, 2 x ROM feed conveyors, and 7 x tipping systems equipped with hydraulic rock breakers.
Petra Diamonds
Finsch Diamond Mine
Block 5 Ground HandlingTurnkey design and installation: 9 tipping arrangements, 4 ore passes (5.1m dia x 180m length), 4 bulkheads, 4 apron feeders, 2 vibrating grizzlies, 2 jaw crushers, and 1,650m total incline conveyor systems.
Petra Diamonds
Cullinan Mine
C-Cut II & CC1E Ground HandlingDesign and erection of double tips, rock breakers, jaw crushers, knifegate bunker retaining walls, hybrid crossover feeders, and conveyor reticulation.
Lucara Diamond Karowe Mine
(Botswana)
Underground Infrastructure & DewateringCrusher conveyor system (CV01, CV02, CV03), 285 Level high-head pump station featuring 12 x SP200 positive displacement pumps delivering across 700m vertical head, and 316L underground TMM workshop.
Harmony Gold Tshepong &
Bambanani
Shaft Pillar & Decline ProjectsBambanani 26° decline shaft winder, 3x 1200kW 6-stage Sulzer pumps, Hi-rate settlers & filter press. Tshepong Sub 75 twin decline conveyor system (690m, 185kW) and dirty water cascade pumping.
Envusa Energy
Mooiplaats Solar PV, Northern Cape
Utility-Scale Solar PV InstallationThree blocks, 32.75 MW, completed July to December 2025: drilling of 300 mm and 400 mm holes and pile placement (8,940), installation of 755 single-axis PV trackers and 40,909 PV modules. EPC contractor: CEEC-CGGC-MEIS Joint Venture.

Have a Project in Mind?

Tell us about your project and our team will help you find the right solution.

Shopping Basket