Engineering drawing for Harmony Gold Bambanani and Tshepong decline projects

Harmony Gold: Bambanani & Tshepong

Shaft pillar removal and decline projects for Harmony Gold.

TDS delivered the Bambanani shaft pillar removal, including the clearwater pump station with settling system, and the Tshepong Sub 75 decline including the dirty water cascade pumping system.

The Tshepong project was taken from pre-feasibility through feasibility to execution design.

Engineering drawing for Harmony Gold Bambanani and Tshepong decline projects
ClientHarmony Gold
ProjectBambanani Shaft Pillar Removal and Tshepong Sub 75 Decline
ScopeDecline infrastructure, clearwater pumping and settling, and dirty water cascade pumping

Project at a Glance

26°

Bambanani decline shaft

6

Levels with stations at Bambanani

3 x 1200 kW

6-stage Sulzer clearwater pumps

690 m

Tshepong decline conveyor at 9°

Scope of Work

Bambanani Shaft Pillar Removal

  • 26° decline shaft with a double drum winder
  • 6 levels with stations
  • Materials car with a special hydraulic lifting arrangement to dock at each station
  • Two loading arrangements
  • Clearwater pumping: three 1200 kW 6-stage Sulzer pumps with hi-rate settlers and a filter press
  • Spillage handling arrangement incorporating two conveyors
  • Chairlift system to travel between levels

Tshepong Sub 75 Decline

  • Twin decline system at 9°: conveyor and material decline combined with a separate personnel decline with a chairlift
  • Decline conveyor: 185 kW, 300 tons per hour, 2 m/s, 690 m at 9°, 1050 mm belt
  • Decline single drum winder: 160 kW, 9 tons, 5 m/s
  • Dirty water cascade pumping from shaft bottom into the settling system of the current mine
  • Two de-gritting systems ahead of the dirty water dams
  • Settling and filter press system upgraded with a hi-rate settler and an additional filter press

Design and Drawings

Engineering drawing for Harmony Gold Bambanani and Tshepong decline projects
Engineering drawing for Harmony Gold Bambanani and Tshepong decline projects
Engineering drawing for Harmony Gold Bambanani and Tshepong decline projects
Engineering drawing for Harmony Gold Bambanani and Tshepong decline projects

Have a Project in Mind?

Tell us about your project and our team will help you find the right solution. You can also view our Selected Major Project Track Record.

Back to all Projects

Shopping Basket