Selected Major Project Track Record
Underground and surface mining infrastructure delivered for leading mining groups.
Project Spotlights
A closer look at selected ground handling and conveyor projects.

Finsch Diamond Mine
Block 5 ground handling: ore pass and crusher systems, designed and installed.

Cullinan Diamond Mine: C-C 1 East
Design of the entire ground handling system at CC1E.

Cullinan: C-Cut Phase 2
Ground handling system design for the C-Cut Phase II project.

Platreef Mine EC&I
Phase 2 turnkey electrical, control and instrumentation for Ivanhoe Mines.

Venetia Underground
Phase 1 underground infrastructure for De Beers Group across four levels.

Nchwaning I & III
Complete ground handling installation for Assmang Manganese.

Karowe Mine
Crusher conveyors, high-head pump station and workshop for Lucara Diamond.

Harmony Gold
Tshepong and Bambanani shaft pillar and decline projects.

Mooiplaats Solar PV
Pile foundations, trackers and PV modules for a 32.75 MW solar plant in the Northern Cape.
| Client & Mine | Project Focus | Technical Scope & Key Deliverables Executed |
|---|---|---|
| Ivanhoe Mines Platreef Mine | Phase 2 EC&I Infrastructure | Turnkey surface & underground EC&I: Main vent fans, fridge plant, chillers, winder house MV substation, PFC yard, underground crushers, conveyors, fuel/lubrication/emulsion distribution stations, and shaft depth detection. |
| De Beers Group Venetia Underground | Phase 1 CSMPP Underground Infrastructure | Structural, mechanical, piping, and EC&I installation across Levels 51, 54, 56, and 59. Hydro-actuated ventilation doors, high-pressure water doors, water walls, civil substations, degritter systems, and main pump station. |
| Assmang Manganese Nchwaning I & III | Phase 1 & 2 Infrastructure | Complete ground handling installation: Primary jaw crusher station, 6 x crusher feed conveyors, 2 x ROM feed conveyors, and 7 x tipping systems equipped with hydraulic rock breakers. |
| Petra Diamonds Finsch Diamond Mine | Block 5 Ground Handling | Turnkey design and installation: 9 tipping arrangements, 4 ore passes (5.1m dia x 180m length), 4 bulkheads, 4 apron feeders, 2 vibrating grizzlies, 2 jaw crushers, and 1,650m total incline conveyor systems. |
| Petra Diamonds Cullinan Mine | C-Cut II & CC1E Ground Handling | Design and erection of double tips, rock breakers, jaw crushers, knifegate bunker retaining walls, hybrid crossover feeders, and conveyor reticulation. |
| Lucara Diamond Karowe Mine (Botswana) | Underground Infrastructure & Dewatering | Crusher conveyor system (CV01, CV02, CV03), 285 Level high-head pump station featuring 12 x SP200 positive displacement pumps delivering across 700m vertical head, and 316L underground TMM workshop. |
| Harmony Gold Tshepong & Bambanani | Shaft Pillar & Decline Projects | Bambanani 26° decline shaft winder, 3x 1200kW 6-stage Sulzer pumps, Hi-rate settlers & filter press. Tshepong Sub 75 twin decline conveyor system (690m, 185kW) and dirty water cascade pumping. |
| Envusa Energy Mooiplaats Solar PV, Northern Cape | Utility-Scale Solar PV Installation | Three blocks, 32.75 MW, completed July to December 2025: drilling of 300 mm and 400 mm holes and pile placement (8,940), installation of 755 single-axis PV trackers and 40,909 PV modules. EPC contractor: CEEC-CGGC-MEIS Joint Venture. |